Repack Transition

Phase 4 of the 600 MHz Repack is completed in the NYC metro market.  Data in this graph compares the current scan data to post repack simulated scan data. The DTV stations listed are in their post-repack spectrum location.

I am leaving this up for now for a reference, for coordination purposes us the NYC RF page for current data. The data was calculated from scan data collected on  24FEB2019 from two outside locations in Manhattan. The calculations were using publicly available documents from the FCC. Links to this Data used to make this table are provided for each DTV Station.

  • Inportant Dates
  • August 2, 2019 Phase 4 completed, all UHF DTV Channels in the NYC metro area are required to relocate to their post repack licensed frequency band.
  • May 1, 2020 Phase 9 completed, VHF channel WNET - PBS will move from ch. 13 to ch. 12
  • July 13, 2020 is the final date that the 600 MHz spectrum band is available is available for production RF use.

Green: 24FEB2019

Magenta: Post repack

Ch.14 470-476

New York 14

Public Safety

Ch.15  476-482

New York 15

Public Safety

Ch.16  482-488

New York 16

Public Safety

Ch.17  488-494

W20EF-D Jewelry TV

Trump World Tower

FCC app pending

Ch.18  494-500

WMBC-TV IND

One WTC

No Change

FCC Query ERP 700kW

Ch.19  500-506

Public Safety, NJ

Ch.20  506-512

W20EF-D Jewelry TV

Trump World Tower

On Air 01JUN2018

FCC Query ERP 6.02kW

Ch.21  512-518

To Be Vacated by 8/2/2019

Ch.22  518-524

WDVB-CD IND

Empire State Bldg.

To be completed by 8/2/2019

FCC Query ERP 15kW

Ch.23  524-530

Repack to Ch. 22

To be completed by 8/2/2019

Ch.24  530-536

WNYE-TV ETV

4 Times Square

Completed

FCC Query ERP 180kW

Ch.25  536-542

WWOR MY NY

Empire State Bldg.

Tx Moving to One WTC

FCC Query ERP 57.8kW

Ch.26  542-548

WFUT-DT UNI

Empire State Bldg.

To be completed by 8/2/2019

FCC Query ERP 155 kW

Ch.27  548-554

WNYW FOX

Empire State Bldg

FCC Query ERP

New Transmitter Active

Ch.28 554-560.

Ch.29  560-566

Ch.30  566-572

Repack to Ch. 26

To be completed by 8/2/2019

Ch.31  572-578

Repack to Ch. 34

To be completed by 8/2/2019

Ch.32  578-584

WXNY-LD

To be completed by 8/2/2019

FCC Query ERP 7.5kW

???

Ch.33  584-590

Repack to Ch. 36

To be completed 8/1/19 1 pm

Ch.34  590-596

WPXN-TV ION

One WTC

FCC Query ERP 170kW

Ch.35  596-602

WNJU Telemundo

One WTC

FCC Query ERP 595kW

Ch.36  602-608

WCBS_TV CBS FCC Query

ERP 548kW 1 WTC

WNBC NBC FCC Query

750kW 1 WTC